{"id":1014,"date":"2026-06-01T11:00:00","date_gmt":"2026-06-01T05:30:00","guid":{"rendered":"https:\/\/shmsolutions.in\/blog\/?p=1014"},"modified":"2026-06-11T13:02:51","modified_gmt":"2026-06-11T07:32:51","slug":"hms-implementation-timeline-week-by-week","status":"publish","type":"post","link":"https:\/\/shmsolutions.in\/blog\/hms-implementation-timeline-week-by-week\/","title":{"rendered":"How Long Does HMS Implementation Actually Take? A Week-by-Week Breakdown"},"content":{"rendered":"\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"3605\" height=\"2403\" src=\"https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Multidisciplinary-hospital-team-in-staff-training-and-go-live-preparation-meeting-for-HMS-rollout.jpg\" alt=\"A diverse group of doctors, nurses, and hospital staff seated around a conference table in a glass-walled meeting room, representing the staff training and user acceptance testing phases of a Hospital Management System implementation\" class=\"wp-image-1018\" style=\"aspect-ratio:1.5002344116268167;width:593px;height:auto\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Every hospital administrator who has ever evaluated a <a href=\"https:\/\/www.shmsolutions.in\/\" data-type=\"link\" data-id=\"https:\/\/www.shmsolutions.in\/\">Hospital Management System<\/a> has asked the same question at some point in the conversation. Not &#8220;how much does it cost&#8221; and not &#8220;what features does it have.&#8221; The first real question is always some version of: <strong>how long is this going to take?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is a completely fair question. Implementing a new HMS is not a small undertaking. It touches every department. It requires staff to change how they work. And it asks leadership to manage a significant operational transition without letting patient care suffer in the process. Understanding the realistic timeline before you start is not just useful planning information, it is the difference between a smooth go-live and a chaotic one.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So here is the honest, week-by-week picture of what HMS implementation actually looks like for a typical hospital or multi-specialty clinic. Not the best-case scenario. Not the vendor&#8217;s optimistic sales deck. The real picture.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Why Most HMS Implementations Take Longer Than Expected<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before we walk through the timeline, it is worth understanding why this process takes the time it does. Many hospital leaders underestimate implementation length because they think of it as a software installation. It is not. It is an organizational change project that happens to involve software.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Three factors consistently extend timelines beyond initial estimates:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Data quality issues<\/strong> \u2014 Most hospitals sitting on years of patient records discover, during migration planning, that their existing data is incomplete, inconsistently formatted, or duplicated across multiple systems. Cleaning that data before migration takes longer than almost any team expects.<\/li>\n\n\n\n<li><strong>Staff resistance and training gaps<\/strong> \u2014 Clinical staff are busy people with no interest in learning a new system unless they understand why it benefits them. Facilities that invest in proper change management and training see faster adoption. Facilities that treat training as a checkbox tend to hit resistance after go-live that costs them weeks of productivity.<\/li>\n\n\n\n<li><strong>Scope creep during configuration<\/strong> \u2014 As the implementation team starts configuring the system, departments begin requesting additional features, custom workflows, and integrations that were not in the original plan. Managing scope tightly from the beginning is one of the most important things hospital leadership can do to protect the timeline.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">With that context in mind, here is what a well-managed HMS implementation actually looks like.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img decoding=\"async\" width=\"3605\" height=\"2403\" src=\"https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Hospital-administrators-and-clinical-team-planning-HMS-implementation-in-a-meeting-room.jpg\" alt=\"A mixed team of hospital administrators and medical professionals in scrubs gathered around a conference table with a laptop and medical files, representing the discovery and scoping phase of a Hospital Management System implementation\" class=\"wp-image-1017\" style=\"aspect-ratio:1.5002344116268167;width:552px;height:auto\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Week-by-Week Implementation Breakdown<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Weeks 1 to 2: Discovery and Project Scoping<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This is the foundation that everything else builds on. Done well, it protects the entire timeline. Rushed, it creates problems that surface at the worst possible moments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During these two weeks, the implementation team and your hospital leadership work through a structured discovery process covering:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Which departments are in scope for this phase<\/li>\n\n\n\n<li>What modules are being implemented and in what order<\/li>\n\n\n\n<li>What your existing data looks like and where it lives<\/li>\n\n\n\n<li>What integrations are needed with third-party systems such as lab equipment, insurance platforms, or radiology software<\/li>\n\n\n\n<li>Who the internal project owner and departmental champions will be<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The output of this phase is a signed scope document and a project plan with clear milestones and ownership at every stage. If your vendor is not producing this document in weeks one and two, that is a warning sign worth paying attention to.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Weeks 3 to 4: System Configuration Begins<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">With scope confirmed, the technical team begins configuring the HMS to match your hospital&#8217;s specific workflows. This is not a generic out-of-the-box setup. A good implementation customises the system around how your departments actually operate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During these two weeks, configuration typically covers:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Department and user role setup<\/li>\n\n\n\n<li>Patient registration workflow and intake forms<\/li>\n\n\n\n<li>Appointment scheduling parameters and availability rules<\/li>\n\n\n\n<li>Billing codes, fee schedules, and insurance panel configuration<\/li>\n\n\n\n<li>Pharmacy formulary and drug interaction database setup<\/li>\n\n\n\n<li><a href=\"https:\/\/shmsolutions.in\/blog\/laboratory-management-software-reduce-errors\/\">Lab test catalogues and result routing rules<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This phase also includes your first round of internal review. Department heads should be walking through their specific workflows in the system and providing feedback before anything is finalised. The cost of changing a workflow at week four is a fraction of what it costs to change it after go-live.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Weeks 5 to 6: Data Migration Planning and Preparation<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This is the phase that hospital administrators most commonly underestimate, and it is the phase most responsible for implementation delays.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Data migration in an HMS context means transferring your existing patient records, billing history, clinical data, and administrative records into the new system in a clean, structured, and usable format. For hospitals that have been operating for years on paper records, spreadsheets, or legacy software, this is a significant undertaking.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The work during these two weeks includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Auditing your existing data sources and identifying what needs to be migrated<\/li>\n\n\n\n<li>Cleaning and standardising data formats to match the new system&#8217;s requirements<\/li>\n\n\n\n<li>Setting up the migration mapping \u2014 defining which data fields move where<\/li>\n\n\n\n<li>Running a first test migration with a sample data set to identify issues before the full migration<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">According to Gartner research cited in an <a href=\"https:\/\/www.oracle.com\/a\/ocom\/docs\/middleware\/data-integration\/data-migration-wp.pdf\" target=\"_blank\" rel=\"noopener\">Oracle data migration whitepaper<\/a>, <strong>83% of data migration projects<\/strong> either fail or exceed their budgets and schedules. For hospitals carrying years of patient records across legacy systems, this is the single most underestimated phase of any HMS implementation. Starting this phase early and treating it with the seriousness it deserves is one of the most impactful decisions a hospital leader can make during implementation.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img decoding=\"async\" width=\"1824\" height=\"1026\" src=\"https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Hospital-staff-reviewing-patient-records-during-HMS-implementation-at-reception.jpg\" alt=\"A doctor and nurse reviewing patient documentation on a clipboard at a hospital reception desk while patients wait in the background, illustrating the administrative workflows that a Hospital Management System helps coordinate\" class=\"wp-image-1015\" style=\"aspect-ratio:1.7778303700854954;width:537px;height:auto\"\/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Weeks 7 to 8: Staff Training Begins<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No HMS implementation succeeds without proper staff training. And proper training means more than a one-hour orientation session the week before go-live. It means role-specific training delivered in advance, with enough time for staff to practice in a test environment before they are using the system with real patients.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A well-structured training programme during this phase covers:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Administrators and front desk staff<\/strong> \u2014 patient registration, appointment scheduling, insurance verification, and billing workflows<\/li>\n\n\n\n<li><strong>Nursing and ward staff<\/strong> \u2014 patient record updates, medication administration documentation, and ward management<\/li>\n\n\n\n<li><strong>Doctors and clinicians<\/strong> \u2014 clinical note entry, prescription writing, lab and radiology order placement, and result review<\/li>\n\n\n\n<li><strong>Finance and billing teams<\/strong> \u2014 charge capture, claim submission, payment posting, and reporting<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Training should happen in a dedicated test environment \u2014 a mirror of the live system populated with dummy data. So staff can make mistakes and learn without any impact on patient records.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The single most important thing hospital leadership can do during this phase is communicate clearly to all staff why the change is happening and what it means for their daily work. Staff who understand the reasoning behind a new system adopt it faster \u2014 and addressing <a href=\"https:\/\/shmsolutions.in\/blog\/how-hms-reduces-healthcare-burnout\/\">clinician burnout<\/a> starts with giving them tools that actually support their work.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Weeks 9 to 10: User Acceptance Testing and Final Checks<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Before go-live, the system needs to be tested by the actual people who will be using it. <a href=\"https:\/\/www.geeksforgeeks.org\/software-testing\/user-acceptance-testing-uat\/\" target=\"_blank\" rel=\"noopener\">User Acceptance Testing (UAT)<\/a> is a structured process where department representatives work through their real daily workflows in the configured system and confirm that everything works as it should.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During this phase, the team is looking for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Workflow gaps \u2014 steps in daily operations that the system does not currently support<\/li>\n\n\n\n<li>Configuration errors \u2014 settings that produce incorrect outputs<\/li>\n\n\n\n<li>Integration failures \u2014 connections to third-party systems that are not working reliably<\/li>\n\n\n\n<li>Training gaps \u2014 areas where staff need additional guidance before go-live<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Every issue identified during UAT is significantly less expensive to fix than the same issue discovered after go-live with real patient data in the system. This phase is not optional and it is not a formality. Hospital leaders who pressure their teams to rush through UAT in the name of staying on schedule consistently regret it.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Week 11: Go-Live Preparation and Final Data Migration<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The week before go-live is one of the most operationally intensive periods of the entire implementation. The full data migration from your legacy system runs during this week, and the team works through a detailed go-live readiness checklist:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>All user accounts created and permissions confirmed<\/li>\n\n\n\n<li>All integrations tested and operational<\/li>\n\n\n\n<li>Backup and contingency procedures documented and communicated<\/li>\n\n\n\n<li>Support coverage confirmed for the first weeks after launch<\/li>\n\n\n\n<li>Final staff briefings completed across all departments<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For larger hospitals, a phased go-live approach is often the right call \u2014 launching with one or two departments first, stabilising, and then rolling out to the full facility. This reduces risk and gives the team a chance to address any issues in a controlled environment before the entire hospital is on the new system.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Weeks 12 to 16: Post-Go-Live Support and Stabilisation<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Go-live is not the finish line. It is the beginning of a new phase \u2014 stabilisation. During the first four weeks after launch, the focus shifts to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Intensive support for staff working in the live system for the first time<\/li>\n\n\n\n<li>Daily monitoring of system performance and data integrity<\/li>\n\n\n\n<li>Rapid resolution of any workflow or configuration issues that emerge<\/li>\n\n\n\n<li>Reinforcement training for staff who are struggling with specific functions<\/li>\n\n\n\n<li>Gathering feedback from department heads for the first optimisation review<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"2279\" height=\"1520\" src=\"https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Patient-checking-in-at-hospital-reception-highlighting-the-need-for-digital-patient-management-systems.jpg\" alt=\"An elderly patient using a walking frame speaking with a nurse at a hospital reception desk while other patients wait, representing the patient registration and scheduling challenges that HMS implementation directly addresses\" class=\"wp-image-1016\" style=\"aspect-ratio:1.4993850178637669;width:490px;height:auto\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What the Total Timeline Looks Like<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For a mid-sized hospital implementing core HMS modules \u2014 patient registration, scheduling, EHR, pharmacy, lab, and billing \u2014 the realistic timeline from project kick-off to stable post-go-live operations is:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Phase<\/strong><\/th><th><strong>Duration<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Discovery and Scoping<\/td><td>Weeks 1 to 2<\/td><\/tr><tr><td>System Configuration<\/td><td>Weeks 3 to 4<\/td><\/tr><tr><td>Data Migration Preparation<\/td><td>Weeks 5 to 6<\/td><\/tr><tr><td>Staff Training<\/td><td>Weeks 7 to 8<\/td><\/tr><tr><td>User Acceptance Testing<\/td><td>Weeks 9 to 10<\/td><\/tr><tr><td>Go-Live Preparation<\/td><td>Week 11<\/td><\/tr><tr><td>Post-Go-Live Stabilisation<\/td><td>Weeks 12 to 16<\/td><\/tr><tr><td><strong>Total Timeline<\/strong><\/td><td><strong>12 to 16 weeks<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Smaller clinics implementing two to three modules can complete this process in six to eight weeks. Larger multi-specialty hospitals or multi-location networks implementing a full suite of modules should plan for four to six months.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What Hospital Leaders Can Do to Protect the Timeline<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Three actions consistently separate on-time implementations from delayed ones:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Appoint a dedicated internal project owner.<\/strong> Not someone who manages this on the side of a full workload. Someone whose primary responsibility during implementation is keeping the project moving, communicating between departments, and escalating issues quickly.<\/li>\n\n\n\n<li><strong>Treat data migration as a standalone work stream.<\/strong> Assign a specific team member to own data quality and migration from week one. Do not wait until week five to start thinking about this.<\/li>\n\n\n\n<li><strong>Communicate early and often with staff.<\/strong> Resistance and slow adoption after go-live add weeks to your stabilization timeline. Investment in change management communication before go-live is always worth it.<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Every hospital administrator who has ever evaluated a Hospital Management System has asked the same question at some point in [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1017,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[62],"tags":[93,94],"class_list":["post-1014","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-healthcare-compliance","tag-hms-implementation","tag-hms-implementation-timeline"],"rttpg_featured_image_url":{"full":["https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Hospital-administrators-and-clinical-team-planning-HMS-implementation-in-a-meeting-room.jpg",3605,2403,false],"landscape":["https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Hospital-administrators-and-clinical-team-planning-HMS-implementation-in-a-meeting-room.jpg",3605,2403,false],"portraits":["https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Hospital-administrators-and-clinical-team-planning-HMS-implementation-in-a-meeting-room.jpg",3605,2403,false],"thumbnail":["https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Hospital-administrators-and-clinical-team-planning-HMS-implementation-in-a-meeting-room.jpg",150,100,false],"medium":["https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Hospital-administrators-and-clinical-team-planning-HMS-implementation-in-a-meeting-room.jpg",300,200,false],"large":["https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Hospital-administrators-and-clinical-team-planning-HMS-implementation-in-a-meeting-room.jpg",1024,683,false],"1536x1536":["https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Hospital-administrators-and-clinical-team-planning-HMS-implementation-in-a-meeting-room.jpg",1536,1024,false],"2048x2048":["https:\/\/shmsolutions.in\/blog\/wp-content\/uploads\/2026\/06\/Hospital-administrators-and-clinical-team-planning-HMS-implementation-in-a-meeting-room.jpg",2048,1365,false]},"rttpg_author":{"display_name":"Narendran Sreekumar","author_link":"https:\/\/shmsolutions.in\/blog\/author\/narendransreekumar\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/shmsolutions.in\/blog\/category\/healthcare-compliance\/\" rel=\"category tag\">Healthcare Compliance Insights &amp; Updates<\/a>","rttpg_excerpt":"Every hospital administrator who has ever evaluated a Hospital Management System has asked the same question at some point in [&hellip;]","_links":{"self":[{"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/posts\/1014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/comments?post=1014"}],"version-history":[{"count":6,"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/posts\/1014\/revisions"}],"predecessor-version":[{"id":1026,"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/posts\/1014\/revisions\/1026"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/media\/1017"}],"wp:attachment":[{"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/media?parent=1014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/categories?post=1014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shmsolutions.in\/blog\/wp-json\/wp\/v2\/tags?post=1014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}